The robot is really coming together now! We got all the Lexan we need and constructed the shooter and conveyer out of the Lexan. We also made a new blog page, kept working on programming the servo, and started on the mascot feet.


One of the team's big season goals was to build a robot that not only functioned well, but also looks pretty sweet. To that end, Bryce wired in LEDs to the electrical board today. Our bot now glows blue or red at the flip of a switch! Bydlon and Brandon got the last pieces of Lexan we needed for the conveyer. With those pieces bought, Ryan went to work putting the conveyer together. We are using big aluminum extrusion as reinforcement instead of c-channel because the Lexan is less rigid than chipboard or plywood. Ryan did an AWESOME job and it looks great. Meanwhile, Tyler went to work tidying up the shooter. We put all the pieces together and just have to mount the wheel and motor to the case. The team spent some time discussing how we are going to decorate all the Lexan we are using (sponsors, logos, colors, etc.). The goal is get everything put together by Thursday. A lofty goal but Team 3313 has come through in the clutch before.

Jenna finished compiling all of the team member interviews into sub team compilations. Be sure to check them out on the new tab at the top of the page or click here, Team Members. Great work by her. The Queen songs at the beginning of each are an homage to our constant Queen playlist in the shop (and love of Queen in Rock Band). The team's constant recruitment push is still going on (we had a new potential member hang out with Jenna today).

Megan and Colin kept working on programming in the servo motor to drop the bridge arm. This is being a real pain because no one on the team has ever programmed one before. Lots of research has yielded nothing so far.

Jesse, Spencer, and some other members started working on the feet of the mascot. The base of the feet is carpet and cardboard with shoes screwed into this. Then you build the cardboard around this. Lots of problem solving to figure out how to do this.Gabe took some great pictures today as well.

Another awesome day of build season. It is so fantastic seeing all of the robot pieces come together to form our finished project. It's slow going because we need to be really precise and make sure it all works. ONLY 15 DAYS LEFT!

Sunday, February 5, 2012

Working For The Weekend

 NEW YOUTUBE VIDEO OF ROBOT DRIVING!

Sorry about the late posting. The team played Rock Band for about 5 hours on Friday evening and then a busy Saturday and Sunday led to a post being written during the Super Bowl. Anyway, Friday was an incredibly exciting day for the team. We finally got the robot driving and shooting basketballs again! We also made a ton of progress on the mascot.

Jesse and Steph have been working their butts off on the mascot. You can really see the progress that they have made so far. Unebelievably awesome. We are for sure going to have the best mascot at our Regional. There is still a lot of work to do but they are doing great.

As far as robot progress, we finished the new electrical board. It looks great and really saves space and weight. Bryce, Bydlon, Tyler, and many other students worked on this project. Bryce worked on Sunday for a couple hours cleaning up the wiring so it looks good and is efficient. The other project holding up driving was the chains on our wheels which we finished as well. Thanks to Zach from last year, we finally found a place to buy Lexan. Ryan and Brandon started making the final shooter and conveyer out of the plexiglass. We are joking that we are going to be called the "ghost robot" because our bot is basically going to be lexan with some aluminum braces.

It was so exciting to see the robot driving around again with the updated electrical board and horn for the bridge. Speaking of which, we brought the holder for the horn over to the Tech who are manufacturing it for us. Also, Spencer brought part of our angle adjuster to his dad to try and make out of metal.

Jenna continued editing team member profiles which will be done very soon.

Only two weeks left.... So awesome.

Thursday, February 2, 2012

Kinect-ing People

Three big developments today. The new (and hopefully final) electrical board is complete, the mascot head is fully painted black (only touch ups left), and we started programming with the Kinect.

The electrical board was fully completed. We took the final step and made the board out of lexan. The extrusion pieces were brought over to the Tech and cut and tapped. All the cords are plugged in and it is ready to go. The only missing part on the front half of the robot is the metal piece to hold the horn for the bridge down. This piece is being manufactured at the Tech and will be ready tomorrow. Their help has been invaluable to the team this year. Cannot thank them enough. The only build aspects left are finding lexan and making the shooter and gatherer out of it. Other than that, we are basically done with initial design. After that, it's testing, testing, testing and refining, refining, refining.

Colin and Megan started fiddling around with the Kinect. Colin got the program (FAAST) to work last night and showed off today. He could use his hands and arms to guide the mouse on his computer which is sweet. The next step is transferring that information over to LabView (the software we do our programming in). One of the team's big goals is to be well rounded and be able to do as many aspects of the competition as possible. This includes, balancing on the bridge, Kinect driving, autonomous mode, picking up basketballs, shooting basketballs accurately, etc.


The other big development is that the helmet of the mascot is pretty much complete. Jesse and Steph finished spray painting both the helmet and the body today. The next step is adding the other color elements.

I said this yesterday but tomorrow we will drive again!! I promise. We will also get plexiglass and start making the gatherer and shooter final parts. The team will start making the bumpers, keep Kinect programming, and post the team member videos.

Wednesday, February 1, 2012

The Chains That Bind You

The high school team members did not have school today so the energy level and focus was really good. There was a lot accomplished on the bot and in other areas. There is a new addition to the blog, we got the wheels chained onto the bot, and we are juuuuuust about done with our new electrical board. We also continued work on the mascot and started fiddling around with Kinect driving.

The big advancements on the robot were chaining the wheels and being very close to finishing the electrical board. Damien and Tyler worked hard on finishing the spacers for the wheels. This is a tedious and annoying process but they did a great job finishing it. Bryce then finished the job off by doing the chain. Again, this is a really annoying process but Bryce powered through and finished them up (hopefully for the last time). The biggest annoyance with the chain is how many times we have had to re-do them. I believe we are on our third or fourth chain attempt. However, it was a huge relief having the robot on all six wheels again. The other big advancement was with the new electrical board. Jordan, Allen and Tyler worked on this aspect. We mounted and wired all of the controllers. Jordan cut the extrusion pieces for mounting the top layer. All that's left is bringing those extrusion pieces over to the Tech to get them tapped (we broke our tap set). We will be driving the robot again tomorrow. YES!

Jenna worked on the blog some more. The team would really like to win a Website Award at our Regional competition. There are tons and tons of criteria to do this including a summary of what FIRST Robotics is about and a team summary. Jenna is working on both of these things. The FIRST Robotics summary is up. Click on the page at the top of the blog to check it out. The team summary will be up tomorrow and on Friday we will upload some Team member interviews so you can better get to know the team.

Jesse and Bryce continued painting the mascot body with black spray paint. Mechatron is going to look awesome! Colin, Megan, and Gabe spent some time today organizing the robot room which was SORELY needed. Great work by them. Cleaning and organizing is an important and thankless job. Colin and Megan started fiddling around with the Kinect driving software while they wait to test new code on the robot. Every FIRST team got a Kinect this year which can be used to drive the robot for the first 15 seconds of the match. It will also be cool to use when we are demonstrating the robot out in the community.


 Nice work and focus by the team today. Hopefully, we are all back on track to make the second half of the build season the best it can be. We will have a driving robot again tomorrow. That will be awesome. Thanks for reading! ROLL OUT!

Saturday, January 28, 2012

The Wheels on the Robot Go Round and Round

Today was not the best day ever. After working really hard the past three days and having a ton of success picking up balls and shooting them, we finally started to tackle our other issues. Those being: bringing down the bridge (so we can drive over it) and changing the wheels (so we can drive over the bump). The problem is that these issues are not as easily fixed. We also fixed some programming issues, worked on the mascot some more, and finished up getting ready for the Ice Fishing Tournament fundraiser.

Before we started working on the robot again, the team got together and had a meeting. During the meeting, we discussed some important upcoming dates. The dates included the ice fishing tournament, a team movie showing (Real Steel), the last day of build season, the Duluth regional visit, and the U of M Regional. We also discussed a media release form and, in general, how the team is doing. Good times and lots of laughs also occurred.

After that, we moved down to the robot room to start working. Our first task was the completely take apart the bot. This was necessary to fix our wheel situation. Initially, we just threw the kit wheels on but they have a 3" radius. The bump in the middle of the field is 4". This will not work. Our plan is to put 4" radius wheels on stilts and then have two of the 3" radius wheels at the very front of the robot. The small wheels will help the big wheels get a little bit off the ground and then the big wheels will push the rest of the way (that's the plan anyway.........). The mental fatigue of build season definitely showed. Bydlon and Bryce took off and put on the big wheels about 6 times because they kept forgetting to do something or how something would change. For example, the wheels got put on but then they had to make a new hole for the smaller wheels. Then they put the frame pieces on backwards. Then the frame was too low so that had to fixed. We think we finally have a plan that will work which will get done tomorrow.

Ryan and Brandon worked hard on getting an arm mechanism working for pushing down the bridge. We have called them "tusks" in the past but the new mechanism looks remarkably like the minibot arm deployer from last year. It's an arm that swings down with an angle on the front to slide the bridge down. We will test it tomorrow.

Colin and Megan worked their tails off fixing programming issues. We are learning as we go and the new thing we learned today was how to program in a spike relay so we can make a motor got forward and backward. Awesome work by them. 

Jesse and Gabe worked on the mascot some more. They finally an upper body piece that seems to work. Jenna worked on sending out emails to the PMMC and arranging the Ice Fishing Tournament. She also started editing the video for student profiles on the website. Sertoma Club in Alexandria puts on an Ice Fishing Tournament every winter. This year, they asked us to sell pizzas during the tournament. We are working with Dominos on this fundraiser. We get some of the profit for selling the pizzas. It is a really good opportunity for us to make some money and to get some more community exposure.

Tomorrow will be better after a good nights sleep.

Tuesday, January 24, 2012

Fasten Your Safety Belts

Sorry for the late post tonight. The three big projects for today were putting the robot parts all together, building the hoop apparatus, and continuing to make the mascot head. A couple new videos on YouTube to check out as well.


Bydlon bought more belts (thus the title) for the gatherer last night so Ryan spent most of the early part of the afternoon fixing the gatherer dowels to work with the added belts. The added surface area of the additional belts really helped catch the balls and propel them up from the ground. Then Bryce, Bydlon, and Ryan worked on attaching the shooter to the top of the gatherer. The big advancement here was that we decided to switch the shooter around so it shoots over the electrical box. Kind of a big change but it makes mounting it and getting the balls to the shooter wheel much easier. HUGE MOMENT watching the balls be picked up and shot all in one motion from the driver station. Colin and Megan worked hard on fixing the programming issues with the shooter and gatherer. Now it's refining the process including (hopefully) a lazy susan (for turning the shooter), adjusting the angle (for shooting from different distances), and attaching the camera (for vision targeting). So not much to do... Not.

Another project that Damien, Spencer, and Jordan worked on was putting all of the wood together to form the base of the hoop apparatus. This will be key for refining and fixing the shooting mechanism. All that's left is buying the hoops and attaching those to the backboards. The robot room is completely full with the hoop apparatus, the bridge, the bump plus all of our other robotics pieces. It's kind of a mess right now.

Jesse and Steph continued their diligent work on the mascot helmet. They are really close to getting done with it though. They are even at the point where they tested spray paint on different test surfaces (cardboard, duct tape, and hot glue) to see how it looks. It looks fantastic.

Other small projects included:
  • More people proofreading the Business Plan by Jenna.
  • Bringing some pieces over to Alex Tech for prototyping the sweeper in front of the gatherer. (done by Brandon and Tyler)
  • Finishing up team member interviews
Another productive day with lots of rewards. Bydlon is going to a programming class in the Cities tomorrow but will be back in time to open the shop for work. Hopefully we will have a smoother transition from the gatherer to the shooter and made some progress on a lazy susan prototype. We also want to finish the helmet (other than painting) and get the camera working. Thanks for reading!

Monday, January 23, 2012

Three Exciting Moments

Another awesome day for Mechatronics. We got a lot accomplished. I realize I say that a lot but it is amazing how much the team accomplishes every day. It is a testament to their dedication and ingenuity. I am continually impressed. The biggest excitement today was that we picked a ball up off the ground, made some baskets with our shooter, started on the hoop apparatus, and made a ton of progress on the mascot head.

The frist big moment of the day was that Brandon, Bydlon, Bryce, and Tyler brought the shooter down to the gym and made 5 (!!!!) baskets in a row. It was a very exciting feeling to actually see the shooter accomplish the goal we set out for it. We tried shooting the ball with the wheel above (opposite of what we planned) and kept missing the hoop. Finally, someone suggested we switch it up and it worked! The whole idea of trying this came from a student in Bydlon's class 7th period. The fact that this never even crossed anyone's mind is slightly embarrassing.

The next super exciting moment was that we picked a ball up off the ground and got it to the top of the gatherer! Two weeks of hard work paid off in about 5 seconds. Super exciting! Damien and Molly brought some parts over to the Tech to get them cut for us. These parts were obstructing the path of the ball. We originally had some issues with the buttons on the drive station and the gatherer but Colin worked his butt off and fixed them. Our next goal is to fully refine the gatherer by having five belts. This will get finished tomorrow. After that, we need to add on the shooter.

The third super exciting moment was seeing the helmet of the mascot come together. Jenna and Jesse worked so hard on the mascot helmet today. The tedious nature of the project cannot be overstated. However, the end product will be well worth it. Great job by Jesse and Jenna on the project today.

Bydlon and Bryce bought and cut all of the wood for the Hoop Apparatus. This will come in helpful when we are testing our shooter on the real game hoop set up. The tests today in the gym were good for our confidence but as far as actually proving we can succeed... We need the real thing to work on. This should be completed tomorrow.

So many exciting things still coming up. We already checked off about 4 or 5 goals for the week which is amazing! More to come tomorrow.

Thursday, January 19, 2012

Don't Worry, It's Just A Prototype


The title for this post is our team's motto so far this year. Whenever we're building anything and someone raises a concern, we jokingly say that line. Then we brainstorm ways to fix it. Today was another really awesome day for the team. So many things started and finished. So many laughs and positive energy. One of those days that makes FIRST Robotics awesome. Everybody was on their game as far as keeping busy but still having fun. Our projects included: mounting the electrical board, mounting the gatherer and shooter, finishing the bridge, starting the mascot helmet and beginning out team member profiles.

Remember to check YouTube for 4 (!!!!) new videos.


We finished the bridge!! That's two out of three game pieces completed. The only one left is the hoop aparatus. Brandon, Molly, Tyler, Connor, and some others really worked hard on getting the bridge done and it looks awesome. We put it through its paces by having some people walk and balance on it. Pretty soon (tomorrow) we will be able to drive our robot over it. We finished the other piece of the middle of the game field, the bump, on Monday. These two elements will be crucial for testing our design next week.

Another huge project for today was completely mounting the prototype robot. We finished the electrical board box by adding a bottom and a side. The box looks great already (go wire management and zip ties!!) but will look even more awesome when we make it out of lexan and put the red and blue LEDs in it. Our first step was putting the gear boxes back on the frame. Then, we mounted the electrical board and battery. Our last step was to mount the gatherer and shooter. Tyler had a great idea for mounting the gatherer and many others on the team helped out with this process. We finished by mounting the gate mechanism and testing it out. SO COOL WITH IT ALL TOGETHER! The feeling you get when a group has an idea and finally sees that idea in a real life way is impossible to describe. So proud of the team so far. This is MILES ahead of where we were last year. Still a lot to accomplish, however.

The PR team started working on the mascot. They first step is creating the helmet. Already looks pretty cool. Jesse and Bryce modeled the helmet throughout the afternoon. Hopefully, the helmet will be finished by tomorrow or Saturday. They also came up with a name for our mascot... Mechatron. PERFECT!



Megan, Jenna, and Allen came up with some questions to ask team members for youtube videos and member profiles for the blog. There are some really funny questions and the profiles should be entertaining. Check back some time in the next week or so for those.

We finished the day with a clean-up/dance party to LMFAO. Great times. 

Having a prototype together makes troubleshooting and brainstorming much easier in the coming weeks. Our big goal for tomorrow or Saturday is to drive the prototype and pick up a ball and shoot it all in one motion. This is ambitious but the team can definitely do it. Fantastic feeling leaving the robot room and seeing all the checks on our weekly goals.