Sunday, March 11, 2012

Scouting Ahead

At one of the team's first meetings of the year, we all came together and decided on season goals. The big question: What did we want to accomplish this year? Some answers included:
  • Make it to the elimination rounds of our Regional Competition(s)
  • Go to two Regionals (Lake Superior and 10K Lakes)
  • Recruit more team members (Have at least 15 people on the team)
  • Expand our community awareness
  • Compete in various awards (Entrepreneurship, Website, etc.)
We have worked really hard for almost 5 months straight now to complete all of those goals. Unfortunately, we did not fund-raise enough money to attend both the Lake Superior and 10K Lakes Regionals. It costs $5000 to register for one and an additional $4000 to attend another. We did not want to miss out on the opportunity to scout and research however. So the team attended the Lake Superior Regional as spectators. 


Monday, February 6, 2012

Ghost Robot

The robot is really coming together now! We got all the Lexan we need and constructed the shooter and conveyer out of the Lexan. We also made a new blog page, kept working on programming the servo, and started on the mascot feet.


One of the team's big season goals was to build a robot that not only functioned well, but also looks pretty sweet. To that end, Bryce wired in LEDs to the electrical board today. Our bot now glows blue or red at the flip of a switch! Bydlon and Brandon got the last pieces of Lexan we needed for the conveyer. With those pieces bought, Ryan went to work putting the conveyer together. We are using big aluminum extrusion as reinforcement instead of c-channel because the Lexan is less rigid than chipboard or plywood. Ryan did an AWESOME job and it looks great. Meanwhile, Tyler went to work tidying up the shooter. We put all the pieces together and just have to mount the wheel and motor to the case. The team spent some time discussing how we are going to decorate all the Lexan we are using (sponsors, logos, colors, etc.). The goal is get everything put together by Thursday. A lofty goal but Team 3313 has come through in the clutch before.

Jenna finished compiling all of the team member interviews into sub team compilations. Be sure to check them out on the new tab at the top of the page or click here, Team Members. Great work by her. The Queen songs at the beginning of each are an homage to our constant Queen playlist in the shop (and love of Queen in Rock Band). The team's constant recruitment push is still going on (we had a new potential member hang out with Jenna today).

Megan and Colin kept working on programming in the servo motor to drop the bridge arm. This is being a real pain because no one on the team has ever programmed one before. Lots of research has yielded nothing so far.

Jesse, Spencer, and some other members started working on the feet of the mascot. The base of the feet is carpet and cardboard with shoes screwed into this. Then you build the cardboard around this. Lots of problem solving to figure out how to do this.Gabe took some great pictures today as well.

Another awesome day of build season. It is so fantastic seeing all of the robot pieces come together to form our finished project. It's slow going because we need to be really precise and make sure it all works. ONLY 15 DAYS LEFT!

Sunday, February 5, 2012

Working For The Weekend

 NEW YOUTUBE VIDEO OF ROBOT DRIVING!

Sorry about the late posting. The team played Rock Band for about 5 hours on Friday evening and then a busy Saturday and Sunday led to a post being written during the Super Bowl. Anyway, Friday was an incredibly exciting day for the team. We finally got the robot driving and shooting basketballs again! We also made a ton of progress on the mascot.

Jesse and Steph have been working their butts off on the mascot. You can really see the progress that they have made so far. Unebelievably awesome. We are for sure going to have the best mascot at our Regional. There is still a lot of work to do but they are doing great.

As far as robot progress, we finished the new electrical board. It looks great and really saves space and weight. Bryce, Bydlon, Tyler, and many other students worked on this project. Bryce worked on Sunday for a couple hours cleaning up the wiring so it looks good and is efficient. The other project holding up driving was the chains on our wheels which we finished as well. Thanks to Zach from last year, we finally found a place to buy Lexan. Ryan and Brandon started making the final shooter and conveyer out of the plexiglass. We are joking that we are going to be called the "ghost robot" because our bot is basically going to be lexan with some aluminum braces.

It was so exciting to see the robot driving around again with the updated electrical board and horn for the bridge. Speaking of which, we brought the holder for the horn over to the Tech who are manufacturing it for us. Also, Spencer brought part of our angle adjuster to his dad to try and make out of metal.

Jenna continued editing team member profiles which will be done very soon.

Only two weeks left.... So awesome.

Tuesday, January 31, 2012

Dogs Days of Build Season

Three weeks from today the build season will be over. Hard to tell if that is a long way away or really, really, soon. The energy level of the team seemed a little lower today. After pushing SO HARD at the beginning of the season to do so many things, it is really hard to keep that energy level up for six consecutive weeks. Luckily, the high school does not have school tomorrow (water main broke). Hopefully everyone on the team can use that time to refresh their batteries. This is like mid July for the baseball season (even the weather felt that way today).

The team worked on a few different projects (as always). The big ones were finishing the horn, assembling our new electrical board, and painting the mascot body. Gabe did a great job taking pictures today.

Many students worked on finishing the horn prototype. We got all the pieces mounted including the arm and the catcher. The new developments were that we got the servo motor which will release the arm mounted. Really good work by Brandon and Tyler mostly. We should be able to fully test it tomorrow.

The other big project was assembling the electrical board. We decided to change it up because of the shooter being switched around. We are going to have all of our electronics mounted in the middle of the bot. The motor controllers, spike relays, power distribution, and side car will be on the bottom level. The modem, cRio, and circuit breaker will be on top. It is a compact design that will end up saving us weight. Bryce, Allen, Bydlon, Gabe, and a few other students worked on it. This will be completed tomorrow. All that's left is mounted the upper level on extrusion.

Jesse and Steph continued their work on the mascot. They started painting the body of the mascot with black spray paint. They also cut out the team's icon which will be painted blue.

Jenna worked on a bunch of different projects. One project was starting the process for going to our Regional at the U of M. This includes making transportation and hotel arrangements. The other project was editing the Business Plan. Jenna had the business teacher at our school read through it and make corrections. Thanks Mrs. Watts!

The team won't meet until 3pm tomorrow because of the school shut down. Hopefully (crossing my fingers and toes), we will finish the electrical board and wheels tomorrow. This will allow us to have a driving robot with added refinements. The rest of the week would then be making our prototypes out of Lexan. Only 21 more days!!

Monday, January 30, 2012

Around the Horn

The biggest excitement for the team today turned out to not really be that exciting after all. The dead line for paying for your second Regional Event (Duluth for us) was Friday but we got it extended to today. We had a bunch of discussions on whether we wanted to go or not. The pros were: more opportunities for advancing to Nationals, another trip to hang out as a team, and another chance to improve the robot before the U of M. The cons were: it costs a lot of money (for individuals and the team), we probably wouldn't be able to bring everyone, it would leave us in a pretty sad state next year and this off season financially, and there would be more school missed. Ultimately we decided against it. The cons really outweighed the pros. We are trying to build something great in our school and community and we want to keep that going rather than take the selfish route and go to Duluth. The U of M is still really awesome and we are doing everything we can during the build season to make a great robot for it.


As far as actual build advancement today, we got quite a bit done. We finished the prototype of the "horn" on the front of the robot. This will allow us to push down the bridge to go to the other side of field or balance on the bridge at the end of the game. Ryan, Tyler, Brandon, and Bydlon worked hard on designing, machining, and mounting the components. Bryce explains in this YouTube video how the mechanism will work. We can't test it quite yet but the concept and execution looks great.

Bryce worked on re-making the electronics board. Our original idea was to have the board vertical connected to the gatherer. Our plans changed last week when we turned the shooter around. So we needed to re-think the board. Our new idea is to mount the electronics in the middle of the bot right in front of the gatherer. We will have two levels of electronics. Bryce made quite a bit of progress. All we have to do is re-mount the components and build the second level. This will be completed tomorrow.

Ryan re-worked the shooter and gatherer connection so the basketball will not get stuck in between. 

Jenna's projects for today included many things. She made a handout about the U of M competition reminding team members we are asking for some monetary contribution to help pay for hotels. She also made some photo collages for new posters (example below). Jenna, Megan, and Colin worked on budgeting out hotels and transportation for the U of M regional. Lots more to do tomorrow.

It was a good day where the team accomplished quite a bit. The sense of accomplishment was back and the energy level was definitely better. Crazy what a day off can do. More excitement tomorrow.

Thursday, January 26, 2012

Blast From The Past

As usual after such an awesome and amazing couple of days where we accomplished SO MUCH, today was a little bit of a thinking and figuring out what to do next sort of day. That doesn't mean we did not accomplish anything, just means we were a little more sluggish and a little less focused. The big accomplishment for today was that we made an angle adjuster mechanism for the shooter. We also continued work on the mascot.

When playing the game at the competition, we want to be able to shoot from different places on the field. To facilitate this, we wanted to adjust the angle of the shooter so we could shoot lower or higher depending on where we are and our battery life and many other factors. This post is titled this way because we ended up using one of the big components from last year: a lead screw and window motor. Last year, two lead screws and two window motors powered our scissor lift. This year, they are powering our angle adjuster. Tyler, Brandon, Bydlon, and Bryce worked on this mechanism. It works great. Colin almost finished the programming for it but had to leave. This will be totally operational tomorrow.

The other big build project was that we wanted to have a sweeper in front of the gatherer. Ryan worked hard on getting it all together. Unfortunately, when we got it all wired up, it kept blowing out fuses and the surgical tubing kept getting stuck in the conveyer belt. So, we decided to keep the sweeper off.

The big electrical project was wiring up the LED's for the driver station. We have a toggle switch so the driver station can light up red or blue depending on which alliance we are assigned.  Bryce and Demian worked on this aspect. The driver station is now complete.

Steph, Jesse, and Gabe kept working on the mascot. They finished the head yesterday and have moved on to the body. Making the dimensions right is a hard task. There are no measurements in what we found online about the mascot so they are basically guessing and checking as they go. This makes work slow. They are plowing ahead though.

Tomorrow will be a better day for work. We will be more rested and more focused. We will have a full team meeting, finish the angle adjuster, and our big goal is to start working on our "tusk" idea for bringing the bridge down. Thanks for reading. Go team 3313!

Wednesday, January 25, 2012

Pictures Are Worth A Thousand Words

So much excitement to be had today! We finished the practice hoop set up. We refined the gatherer and shooter. We made a bunch of baskets. We totally finished the mascot head. We built supports for the gatherer and electrical board. We got a story posted in the Echo Press Newspaper. Todd (Alex Tech professor) stopped by.  We finished the business plan draft. We got the camera to work. So super awesome. I'm too excited to type. I'll just post pictures instead. Click on any to see them bigger. Also remember to check out YouTube for videos from today.
Moustachioed.






SO AWESOME!

MAKING BASKETS!
We have a messy robot room...

Tuesday, January 24, 2012

Fasten Your Safety Belts

Sorry for the late post tonight. The three big projects for today were putting the robot parts all together, building the hoop apparatus, and continuing to make the mascot head. A couple new videos on YouTube to check out as well.


Bydlon bought more belts (thus the title) for the gatherer last night so Ryan spent most of the early part of the afternoon fixing the gatherer dowels to work with the added belts. The added surface area of the additional belts really helped catch the balls and propel them up from the ground. Then Bryce, Bydlon, and Ryan worked on attaching the shooter to the top of the gatherer. The big advancement here was that we decided to switch the shooter around so it shoots over the electrical box. Kind of a big change but it makes mounting it and getting the balls to the shooter wheel much easier. HUGE MOMENT watching the balls be picked up and shot all in one motion from the driver station. Colin and Megan worked hard on fixing the programming issues with the shooter and gatherer. Now it's refining the process including (hopefully) a lazy susan (for turning the shooter), adjusting the angle (for shooting from different distances), and attaching the camera (for vision targeting). So not much to do... Not.

Another project that Damien, Spencer, and Jordan worked on was putting all of the wood together to form the base of the hoop apparatus. This will be key for refining and fixing the shooting mechanism. All that's left is buying the hoops and attaching those to the backboards. The robot room is completely full with the hoop apparatus, the bridge, the bump plus all of our other robotics pieces. It's kind of a mess right now.

Jesse and Steph continued their diligent work on the mascot helmet. They are really close to getting done with it though. They are even at the point where they tested spray paint on different test surfaces (cardboard, duct tape, and hot glue) to see how it looks. It looks fantastic.

Other small projects included:
  • More people proofreading the Business Plan by Jenna.
  • Bringing some pieces over to Alex Tech for prototyping the sweeper in front of the gatherer. (done by Brandon and Tyler)
  • Finishing up team member interviews
Another productive day with lots of rewards. Bydlon is going to a programming class in the Cities tomorrow but will be back in time to open the shop for work. Hopefully we will have a smoother transition from the gatherer to the shooter and made some progress on a lazy susan prototype. We also want to finish the helmet (other than painting) and get the camera working. Thanks for reading!

Monday, January 23, 2012

Three Exciting Moments

Another awesome day for Mechatronics. We got a lot accomplished. I realize I say that a lot but it is amazing how much the team accomplishes every day. It is a testament to their dedication and ingenuity. I am continually impressed. The biggest excitement today was that we picked a ball up off the ground, made some baskets with our shooter, started on the hoop apparatus, and made a ton of progress on the mascot head.

The frist big moment of the day was that Brandon, Bydlon, Bryce, and Tyler brought the shooter down to the gym and made 5 (!!!!) baskets in a row. It was a very exciting feeling to actually see the shooter accomplish the goal we set out for it. We tried shooting the ball with the wheel above (opposite of what we planned) and kept missing the hoop. Finally, someone suggested we switch it up and it worked! The whole idea of trying this came from a student in Bydlon's class 7th period. The fact that this never even crossed anyone's mind is slightly embarrassing.

The next super exciting moment was that we picked a ball up off the ground and got it to the top of the gatherer! Two weeks of hard work paid off in about 5 seconds. Super exciting! Damien and Molly brought some parts over to the Tech to get them cut for us. These parts were obstructing the path of the ball. We originally had some issues with the buttons on the drive station and the gatherer but Colin worked his butt off and fixed them. Our next goal is to fully refine the gatherer by having five belts. This will get finished tomorrow. After that, we need to add on the shooter.

The third super exciting moment was seeing the helmet of the mascot come together. Jenna and Jesse worked so hard on the mascot helmet today. The tedious nature of the project cannot be overstated. However, the end product will be well worth it. Great job by Jesse and Jenna on the project today.

Bydlon and Bryce bought and cut all of the wood for the Hoop Apparatus. This will come in helpful when we are testing our shooter on the real game hoop set up. The tests today in the gym were good for our confidence but as far as actually proving we can succeed... We need the real thing to work on. This should be completed tomorrow.

So many exciting things still coming up. We already checked off about 4 or 5 goals for the week which is amazing! More to come tomorrow.

Sunday, January 22, 2012

Under Pressure

We met on Saturday to keep working for a little while. Weekends are hard days to meet beacuse so many people on the team have family obligations and jobs. However, about 10 members showed up throughout the afternoon. The main project was re-making the gatherer prototype.Then we relaxed and play Rock Band for a while.

The gatherer prototype we created last week was a great proof of concept. However, we changed the design a little bit. We are going to have only one motor powering it. Plus, our last design got a little messed up while creating it (holes in wrong places, not the right size, etc.). So we re-made it and it works great! We are soooo close to picking a ball up off the ground. Just a couple more modifications on Monday and we will be able to do it.

Jenna worked on the business plan some more. We also came up with some goals for Week 3. The big goal is to pick a ball up off the ground and shoot it into a hoop. We also need to build the hoop apparatus.

After working for a while, we ordered pizza and played Rock Band. Build season is intense so it's good to take a break and have some fun. We played a 12 song set of Queen and a bunch of Bon Jovi. We also played Bydlon's favorite songs "Workin for the Weekend" and "We Built This City".

As always, thanks for reading and be sure to check us out on Twitter @team3313, YouTube and Facebook (links up above).

Friday, January 20, 2012

Balancing Act

We finished so many projects yesterday that today was a restarting day. Some of the projects we started on were prototyping ideas for lowering the bridge, prototyping a roller for the front of the robot, making the body for the mascot, and practicing balancing.

The biggest excitement was that we got the robot driving. Colin came and did a really nice job fixing the programming for the robot. It was a very proud moment to see what we have so far driving around the shop. Bryce spent some time getting use to the new tank drive system (last year we had mecanum wheels). He balanced the robot on the bridge a few times too.

The big build projects involved scraping the gate concept. Originally, we made a gate that would hopefully stop balls from coming in to our robot and lower the bridge. We got a lot of comments on our youtube page advising us in a different direction and we saw some other ideas so we decided to scrap it. Instead, we are going to have these things we call tusks that bring the bridge down and a pvc pipe with surgical tubing acting as a sweeper pulling balls in. We are half way there on both ideas. These should be finished by Monday or Tuesday.

The PR team started working on the body of the mascot. The other big project for the PR team was making interview videos to put on a member profile page on this blog. These should be very interesting.

After an awesome day like yesterday where we finished so many things and had so much progress, inevitably there will be a little bit of a let down. The team still worked hard and started some big new projects today. We are meeting on Saturday to work some more and then hang out with some Rock Band and pizza.

Thursday, January 19, 2012

Don't Worry, It's Just A Prototype


The title for this post is our team's motto so far this year. Whenever we're building anything and someone raises a concern, we jokingly say that line. Then we brainstorm ways to fix it. Today was another really awesome day for the team. So many things started and finished. So many laughs and positive energy. One of those days that makes FIRST Robotics awesome. Everybody was on their game as far as keeping busy but still having fun. Our projects included: mounting the electrical board, mounting the gatherer and shooter, finishing the bridge, starting the mascot helmet and beginning out team member profiles.

Remember to check YouTube for 4 (!!!!) new videos.


We finished the bridge!! That's two out of three game pieces completed. The only one left is the hoop aparatus. Brandon, Molly, Tyler, Connor, and some others really worked hard on getting the bridge done and it looks awesome. We put it through its paces by having some people walk and balance on it. Pretty soon (tomorrow) we will be able to drive our robot over it. We finished the other piece of the middle of the game field, the bump, on Monday. These two elements will be crucial for testing our design next week.

Another huge project for today was completely mounting the prototype robot. We finished the electrical board box by adding a bottom and a side. The box looks great already (go wire management and zip ties!!) but will look even more awesome when we make it out of lexan and put the red and blue LEDs in it. Our first step was putting the gear boxes back on the frame. Then, we mounted the electrical board and battery. Our last step was to mount the gatherer and shooter. Tyler had a great idea for mounting the gatherer and many others on the team helped out with this process. We finished by mounting the gate mechanism and testing it out. SO COOL WITH IT ALL TOGETHER! The feeling you get when a group has an idea and finally sees that idea in a real life way is impossible to describe. So proud of the team so far. This is MILES ahead of where we were last year. Still a lot to accomplish, however.

The PR team started working on the mascot. They first step is creating the helmet. Already looks pretty cool. Jesse and Bryce modeled the helmet throughout the afternoon. Hopefully, the helmet will be finished by tomorrow or Saturday. They also came up with a name for our mascot... Mechatron. PERFECT!



Megan, Jenna, and Allen came up with some questions to ask team members for youtube videos and member profiles for the blog. There are some really funny questions and the profiles should be entertaining. Check back some time in the next week or so for those.

We finished the day with a clean-up/dance party to LMFAO. Great times. 

Having a prototype together makes troubleshooting and brainstorming much easier in the coming weeks. Our big goal for tomorrow or Saturday is to drive the prototype and pick up a ball and shoot it all in one motion. This is ambitious but the team can definitely do it. Fantastic feeling leaving the robot room and seeing all the checks on our weekly goals.