Drop Down Menu

Showing posts with label Excited Kids. Show all posts
Showing posts with label Excited Kids. Show all posts

Tuesday, October 23, 2012

Massman Automation Designs



Team 3313 Mechatronics went to Massman Automation Designs in Villard, MN today to do some presentations. We had two different presentation times, one in the morning and one in the evening.

Check out a video recap here.

In the morning, some of the team members met at the Robot Room when school started. We headed down to Massman to present to Minnewaska High School students that were touring. On Monday night, we brought down all the supplies so all we had to do on Tuesday was set them up. The presentation went ok. We did not know how much time we had to talk so that made the first presentation a little disjointed. We recovered for the second presentation however. The morning was a fun experience and Team 3313 welcomes the chance to excite other schools about STEM education and FIRST Robotics. It was a natural progression, talking about high school robotics and then all of the cool stuff Massman makes. The team members headed back to school for the afternoon.

After school was over, a bunch of team members headed back down to Massman for their Open House. Massman opened up its doors for the evening to community members, employee members, and our team. We had the same area set up. The team estimated that we presented to well over 200 people. It was a great experience. Just like the morning, the more presentations we did, the more comfortable we got and the better the experience was for everyone. The team members who came with did a great job of dividing up speaking responsibilities.

The highlight of the night though, was the tour of Massman Automation Designs. Basically, Massman manufactures assembly lines. The assembly lines they build often deal with food products being boxed up and packaged. We saw a line that takes ground turkey packages and boxes them. Then the machine puts the boxes on palates and shrink wraps the palates. It was awesome. Another machine takes 40 lb. blocks of cheese and puts them into packages. A microwave popcorn bag filler that was destined for the country of Hungary was also exciting. It can go up to 200 bags a minute!!! Woah! All the work, time, and care that goes into each machine was really impressive.

Massman is part of the PMMC, one of our major local sponsors. Obviously, we also appreciate the support Massman and the PMMC provide us. It was fun to finally get to see what they do and how it connects to our group. Can't wait to visit our other sponsors!!


Wednesday, October 17, 2012

Many Hands For Lots Of Work


In all honesty, after presenting to the 9th graders yesterday, we expected to have maybe 2 or 3 show up today or in the future. It's a big time commitment and kind of scary to show up to a new thing. Boy, were we wrong. We had 6 show up!! WOAH! That's great! We needed all the help too. Soooo much going today.

The two main priorities for today for the Build Team were getting Murphy driving again and shooting a basketball. Both of these items were possible because we received our new parts from AndyMark (the main robot part distributor). With all of the people hanging out, the work went pretty fast and we got A TON accomplished. It was kind of incredible to watch actually.

The work started with Brandon and Tyler tackling the gearboxes for the drive train. Let's be honest, gearboxes are not the most fun thing to deal with. They require a lot of precision, the parts are really small and have to be put together in a very specific order. However, Brandon and Tyler got them put together and mounted on the robot in a pretty short amount of time. Unfortunately, we had a bunch of other stuff we were working on so we couldn't test the drive train right away.

The other big goal of the Build Team was to shoot a basketball. We wanted to switch out a CIM motor on the shooter for some smaller motors so we could use that CIM in our drive train. Luckily, mounting the new small motors was not that much of a problem. First, Bryce marked the new mounting holes on the wheel mount. Molly brought it over to Alex Tech and got them machined out. Then Bryce mounted the gear box and put it on the robot.

Another thing we are working on for Build Team was mounting the pneumatics components. Pneumatics is using air pressure to move pistons. Demian and David worked on mounting the compressor. It was a process because we had to get mounts made, then putting the mounts on and everything was a paint in the butt. Lots of putting things together and then taking them apart. But that's ok! It looks great and is extremely stable.

Programming team spent a lot of time today just kind of waiting for those upgrades to get finished. Once Murphy was up and driving, there was some time spent debugging and working on different small projects. Like getting the SMART Dashboard up and running and working on the semi-autonomous.

Carson spent pretty much all of today working on a poster for the Massman Open House. One of our awesome sponsors, Massman, is a packaging machine manufacturer. They are opening up their shop to the public on October 23 and we will be a part of it. We will have our robots out and showing them off both to Massman employees and the public.

Kacy had driver's training so she showed up late but still got a lot done. She emailed out our Elden's Grocery Bagging Poster. She also started an email for our Kick-Off workshops. This is a brand new experience for the team so we want the organization to go well at the beginning.

Jesse and some of the other team members made some fixes to the mascot. After all of our public appearances recently, Mechatron was a little worse for wear. Jesse and the others also started coming up with some ideas for how to remake the legs of Mechatron.

Taylor worked on cleaning up more of the Robot Room. With all the activities we have been up to, it got a little messy. That is definitely a goal to have for the year: keep the Robot Room clean and organized more.

Gabe showed up a little bit later. He partnered up with Jesse and started talking and working on some more Chairman's Award activities. They discussed a general layout for the video and some ideas about how to start shooting. They also watched some more examples on YouTube.

After getting everything put together, we tested out driving Murphy and shooting basketballs. It all worked!!! Yay! It was really fun to see Murphy moving around and picking up basketballs again. So proud of all the work and upgrades we have done so far.

There was crazy energy today because of all the newbies and pretty much everyone being in attendance. It was AWESOME!

After working so hard, some of the team members used a 12 sided die to decide where to eat dinner. THen played Rock Band for a while. What a great day.





Friday, April 20, 2012

Lighting the Flame

This has been mentioned many times before but one of our team's main goals for the year was to expand the awareness and knowledge of our team in the community. We have been doing this in a variety of ways this year. We had a video game tournament, visited classrooms, visited local area clubs, presented to our sponsors, created many social network opportunities, and performed at a halftime show. We continued our efforts on Friday when we visited Discovery Middle School and Voyager Elementary School. Click "see more" below to read about how the day went.



Thursday, April 19, 2012

Speaking Tour

It has a long time since a blog post update! Wow! Sorry about that. With the regional over, the team's activity and meetings have kind of slowed down or dwindled. That's ok. We have been pushing ahead with our Community Outreach agenda throughout April. We have presented two of the Alexandria elementary schools along with an area club.

 You really need to check out the video from our presentation at Woodland Elementary School. The excitement of the students was truly amazing. Seriously, stop reading for a minute and watch it. Awesome.